ခါလီဖာ မိုးမျှော်တိုက်: တည်းဖြတ်မှု မူကွဲများ

အရေးမကြီး Bot: Migrating 93 interwiki links, now provided by Wikidata on d:q12495 (translate me)
အရေးမကြီး fixing dead links
စာကြောင်း ၂၂ -
| developer=[[Emaar Properties]]
| architect=[[Adrian Smith (architect)|Adrian Smith]] at SOM
| engineer=[[William F. Baker (engineer)|Bill Baker]] at [[Skidmore, Owings and Merrill|SOM]]<ref>{{cite web|url=http://www.wired.com/culture/design/magazine/15-12/mf_baker|title=Engineer Bill Baker Is the King of Superstable 150-Story Structures|last=Blum|first=Andrew|publisher=Wired|date=27 November 2007|accessdate=11 March 2008|archiveurl=https://archive.is/VWhn|archivedate=18 September 2012}}</ref>
| contractor=[[Samsung C&T]], [[Besix]] and [[Arabtec]]<br /> Supervision Consultant Engineer & Architect of Record [[Hyder Consulting]]<br /> Construction Project Manager [[Turner Construction]]<br />[[Grocon]]<ref name="Contractors">{{cite web|url=http://www.designbuild-network.com/projects/burj/|title=Burj Dubai (Dubai Tower) and Dubai Mall, United Arab Emirates|publisher=''designbuild-network.com''|accessdate=23 March 2009}}</ref><br /> Planning [[Bauer AG]] and [[Middle East Foundations]]<ref name="Contractors" /><br />Lift contractor [[Otis Elevator Company|Otis]]<ref name="Contractors" /><br /> VT consultant [[Lerch Bates]]<ref name="Contractors" />
}}